造价工程师如何做好工程结算审核工作
下面是小编为大家整理的造价工程师如何做好工程结算审核工作,本文共9篇,仅供大家参考借鉴,希望大家喜欢,并能积极分享! 一、接受工程结算审核任务的前期准备 (1)接受业务既要尽力而为,又要量力而行,当公司安排造价工程师承担项目审核时,造价工程师本人应考虑自身的专业能力,充分了解委托目的,工程项目的大致概念,委托前是否初审,审核所需资料的可获取性等。如果超出自身业务能力范围,应及时向公司反映,以便增加
wp-content-crawler
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /www/wwwroot/cuomi.com/wp-includes/functions.php on line 6121